US Bridges

East Lawson Road over S Mesquite Creek Trib

Fair

Dallas County, Texas · 0.05 MI NE of Lasater RD · Structure no. 1805709L3910001

Built
1950
75 years old
Condition
Fair
inspected January 2023
Type
Culvert
Concrete
Length
21 ft
2 main spans
Daily traffic
265
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

East Lawson Road over S Mesquite Creek Trib is a concrete culvert carrying East Lawson Road over S Mesquite Creek Trib in Dallas County, Texas. It was built in 1950, so it is 75 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 265 vehicles a day, projected to reach 750 by 2031. The structure is 21 ft (6.4 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEast Lawson Road
CrossesS Mesquite Creek Trib
Location0.05 MI NE of Lasater RD
RouteCity Street 0
StateTexas
Coordinates32.70042, -96.57141
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length21 ft (6.4 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic265 (2022)
Projected traffic750 by 2031
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$23,000
NavigationNo navigation control on waterway

Frequently asked questions

When was East Lawson Road over S Mesquite Creek Trib built?

It was built in 1950, making it 75 years old in 2025.

What condition is East Lawson Road over S Mesquite Creek Trib in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.

How much traffic does East Lawson Road over S Mesquite Creek Trib carry?

About 265 vehicles per day (2022 count).

How long is East Lawson Road over S Mesquite Creek Trib?

The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3 m).

Who owns East Lawson Road over S Mesquite Creek Trib?

It is owned by the City or Municipal Highway Agency.