US Bridges

Pastor Bailey DR over S Fork Five Mile Creek

Good

Dallas County, Texas · 0.5 MI N of Camp Wisdom · Structure no. 1805709B5830001

Built
1993
32 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
113 ft
1 main span
Daily traffic
1,900
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Pastor Bailey DR over S Fork Five Mile Creek is a prestressed concrete stringer/multi-beam or girder carrying Pastor Bailey DR over S Fork Five Mile Creek in Dallas County, Texas. It was built in 1993, so it is 32 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,900 vehicles a day, roughly 1% of them trucks, projected to reach 2,650 by 2041. The structure is 113 ft (34.4 m) long and 57 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPastor Bailey DR
CrossesS Fork Five Mile Creek
Location0.5 MI N of Camp Wisdom
RouteCity Street 0
StateTexas
Coordinates32.67033, -96.87429
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length113 ft (34.4 m)
Longest span111 ft (33.8 m)
Deck width57 ft (17.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,900 (2021)
Projected traffic2,650 by 2041
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pastor Bailey DR over S Fork Five Mile Creek built?

It was built in 1993, making it 32 years old in 2025.

What condition is Pastor Bailey DR over S Fork Five Mile Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Pastor Bailey DR over S Fork Five Mile Creek carry?

About 1,900 vehicles per day (2021 count), of which roughly 1% are trucks.

How long is Pastor Bailey DR over S Fork Five Mile Creek?

The structure is 113 ft (34.4 m) long with a longest span of 111 ft (33.8 m) and a deck 57 ft wide.

Who owns Pastor Bailey DR over S Fork Five Mile Creek?

It is owned by the City or Municipal Highway Agency.