US Bridges

Holford RD NB over Pgbt

Good

Dallas County, Texas · 0.6MI SE of W Campbell RD · Structure no. 180570296406602

Built
2000
25 years old
Condition
Good
inspected June 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
237 ft
2 main spans
Daily traffic
1,605
2019 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Holford RD NB over Pgbt is a prestressed concrete stringer/multi-beam or girder carrying Holford RD NB over Pgbt in Dallas County, Texas. It was built in 2000, so it is 25 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,605 vehicles a day, roughly 3% of them trucks, projected to reach 8,000 by 2027. The structure is 237 ft (72.2 m) long and 69 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHolford RD NB
CrossesPgbt
Location0.6MI SE of W Campbell RD
RouteCity Street 0
StateTexas
Coordinates32.97038, -96.64835
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2
Design loadHS 20
Structure length237 ft (72.2 m)
Longest span118 ft (36 m)
Deck width69 ft (21.1 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,605 (2019)
Projected traffic8,000 by 2027
Trucks3%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Holford RD NB over Pgbt built?

It was built in 2000, making it 25 years old in 2025.

What condition is Holford RD NB over Pgbt in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.

How much traffic does Holford RD NB over Pgbt carry?

About 1,605 vehicles per day (2019 count), of which roughly 3% are trucks.

How long is Holford RD NB over Pgbt?

The structure is 237 ft (72.2 m) long with a longest span of 118 ft (36 m) and a deck 69 ft wide.

Who owns Holford RD NB over Pgbt?

It is owned by the Local Toll Authority.