US Bridges

Pgbt Nbml over Dwu Access RD

Good

Dallas County, Texas · 0.8 MI S of IH 35E · Structure no. 180570296402596

Built
2006
19 years old
Condition
Good
inspected June 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
356 ft
4 main spans
Daily traffic
54,936
2023 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Pgbt Nbml over Dwu Access RD is a prestressed concrete stringer/multi-beam or girder carrying Pgbt Nbml over Dwu Access RD in Dallas County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 54,936 vehicles a day, projected to reach 12,000 by 2031. The structure is 356 ft (108.5 m) long and 70 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPgbt Nbml
CrossesDwu Access RD
Location0.8 MI S of IH 35E
StateTexas
Coordinates32.97157, -96.9324
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length356 ft (108.5 m)
Longest span112 ft (34.1 m)
Deck width70 ft (21.3 m)
Roadway width67 ft (20.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic54,936 (2023)
Projected traffic12,000 by 2031
Trucks0%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pgbt Nbml over Dwu Access RD built?

It was built in 2006, making it 19 years old in 2025.

What condition is Pgbt Nbml over Dwu Access RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.

How much traffic does Pgbt Nbml over Dwu Access RD carry?

About 54,936 vehicles per day (2023 count).

How long is Pgbt Nbml over Dwu Access RD?

The structure is 356 ft (108.5 m) long with a longest span of 112 ft (34.1 m) and a deck 70 ft wide.

Who owns Pgbt Nbml over Dwu Access RD?

It is owned by the Local Toll Authority.