US Bridges

Pgbt SB to IH635WB over IH635WBFR & Valley Ranch

Good

Dallas County, Texas · At SH 190 & IH 635 · Structure no. 180570296402576

Built
2006
19 years old
Condition
Good
inspected June 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
2,092 ft
18 main spans
Daily traffic
9,891
2019 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Pgbt SB to IH635WB over IH635WBFR & Valley Ranch is a prestressed concrete stringer/multi-beam or girder carrying Pgbt SB to IH635WB over IH635WBFR & Valley Ranch in Dallas County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,891 vehicles a day, projected to reach 13,847 by 2040. The structure is 2,092 ft (637.6 m) long and 28 ft wide.

CarriesPgbt SB to IH635WB
CrossesIH635WBFR & Valley Ranch
LocationAt SH 190 & IH 635
StateTexas
Coordinates32.91291, -96.9428
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans18
Design loadHS 20
Structure length2,092 ft (637.6 m)
Longest span120 ft (36.6 m)
Deck width28 ft (8.5 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,891 (2019)
Projected traffic13,847 by 2040
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pgbt SB to IH635WB over IH635WBFR & Valley Ranch built?

It was built in 2006, making it 19 years old in 2025.

What condition is Pgbt SB to IH635WB over IH635WBFR & Valley Ranch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.

How much traffic does Pgbt SB to IH635WB over IH635WBFR & Valley Ranch carry?

About 9,891 vehicles per day (2019 count).

How long is Pgbt SB to IH635WB over IH635WBFR & Valley Ranch?

The structure is 2,092 ft (637.6 m) long with a longest span of 120 ft (36.6 m) and a deck 28 ft wide.

Who owns Pgbt SB to IH635WB over IH635WBFR & Valley Ranch?

It is owned by the Local Toll Authority.