Pgbt NB over Spur 303 / Pioneer Pkwy
GoodDallas County, Texas · 2.35 MI N of IH 20 · Structure no. 180570296401533
- Built
- 2012
- 13 years old
- Condition
- Good
- inspected May 2022
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 243 ft
- 1 main span
- Daily traffic
- 7,729
- 2015 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Pgbt NB over Spur 303 / Pioneer Pkwy is a prestressed concrete stringer/multi-beam or girder carrying Pgbt NB over Spur 303 / Pioneer Pkwy in Dallas County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,729 vehicles a day, roughly 5% of them trucks, projected to reach 48,700 by 2035. The structure is 243 ft (74.1 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pgbt NB over Spur 303 / Pioneer Pkwy built?
It was built in 2012, making it 13 years old in 2025.
What condition is Pgbt NB over Spur 303 / Pioneer Pkwy in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.
How much traffic does Pgbt NB over Spur 303 / Pioneer Pkwy carry?
About 7,729 vehicles per day (2015 count), of which roughly 5% are trucks.
How long is Pgbt NB over Spur 303 / Pioneer Pkwy?
The structure is 243 ft (74.1 m) long with a longest span of 125 ft (38.1 m) and a deck 70 ft wide.
Who owns Pgbt NB over Spur 303 / Pioneer Pkwy?
It is owned by the Local Toll Authority.