US Bridges

Pgbt SB over W Marshall DR

Good

Dallas County, Texas · 2.88 MI S of IH 30 · Structure no. 180570296401501

Built
2012
13 years old
Condition
Good
inspected May 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
208 ft
1 main span
Daily traffic
10,000
2013 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Pgbt SB over W Marshall DR is a prestressed concrete stringer/multi-beam or girder carrying Pgbt SB over W Marshall DR in Dallas County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,000 vehicles a day, roughly 1% of them trucks, projected to reach 56,900 by 2030. The structure is 208 ft (63.4 m) long and 74 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPgbt SB
CrossesW Marshall DR
Location2.88 MI S of IH 30
StateTexas
Coordinates32.72138, -97.02264
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMay 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1 (+2 approach)
Design loadHL 93
Structure length208 ft (63.4 m)
Longest span100 ft (30.5 m)
Deck width74 ft (22.7 m)
Roadway width68 ft (20.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,000 (2013)
Projected traffic56,900 by 2030
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pgbt SB over W Marshall DR built?

It was built in 2012, making it 13 years old in 2025.

What condition is Pgbt SB over W Marshall DR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2022.

How much traffic does Pgbt SB over W Marshall DR carry?

About 10,000 vehicles per day (2013 count), of which roughly 1% are trucks.

How long is Pgbt SB over W Marshall DR?

The structure is 208 ft (63.4 m) long with a longest span of 100 ft (30.5 m) and a deck 74 ft wide.

Who owns Pgbt SB over W Marshall DR?

It is owned by the Local Toll Authority.