Pgbt Sbml over Carrier Pky & Johnson CR
GoodDallas County, Texas · 0.66 MI N of IH 30 · Structure no. 180570296401072
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,910 ft
- 3 main spans
- Daily traffic
- 35,540
- 2011 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Pgbt Sbml over Carrier Pky & Johnson CR is a steel continuous stringer/multi-beam or girder carrying Pgbt Sbml over Carrier Pky & Johnson CR in Dallas County, Texas. It was built in 2009, so it is 16 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 35,540 vehicles a day, projected to reach 59,660 by 2031. The structure is 1,910 ft (582.2 m) long and 93 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pgbt Sbml over Carrier Pky & Johnson CR built?
It was built in 2009, making it 16 years old in 2025.
What condition is Pgbt Sbml over Carrier Pky & Johnson CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Pgbt Sbml over Carrier Pky & Johnson CR carry?
About 35,540 vehicles per day (2011 count).
How long is Pgbt Sbml over Carrier Pky & Johnson CR?
The structure is 1,910 ft (582.2 m) long with a longest span of 210 ft (64 m) and a deck 93 ft wide.
Who owns Pgbt Sbml over Carrier Pky & Johnson CR?
It is owned by the Local Toll Authority.