US Bridges

Egyptian Way EB over Pgbt

Fair

Dallas County, Texas · 0.37 MI N of IH 30 · Structure no. 180570296401065

Built
2009
16 years old
Condition
Fair
inspected April 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
299 ft
3 main spans
Daily traffic
1,538
2019 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Egyptian Way EB over Pgbt is a prestressed concrete stringer/multi-beam or girder carrying Egyptian Way EB over Pgbt in Dallas County, Texas. It was built in 2009, so it is 16 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,538 vehicles a day, roughly 13% of them trucks, projected to reach 8,195 by 2036. The structure is 299 ft (91.1 m) long and 69 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEgyptian Way EB
CrossesPgbt
Location0.37 MI N of IH 30
RouteCity Street 0
StateTexas
Coordinates32.7648, -97.02937
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length299 ft (91.1 m)
Longest span105 ft (32 m)
Deck width69 ft (21 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,538 (2019)
Projected traffic8,195 by 2036
Trucks13%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Egyptian Way EB over Pgbt built?

It was built in 2009, making it 16 years old in 2025.

What condition is Egyptian Way EB over Pgbt in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2022.

How much traffic does Egyptian Way EB over Pgbt carry?

About 1,538 vehicles per day (2019 count), of which roughly 13% are trucks.

How long is Egyptian Way EB over Pgbt?

The structure is 299 ft (91.1 m) long with a longest span of 105 ft (32 m) and a deck 69 ft wide.

Who owns Egyptian Way EB over Pgbt?

It is owned by the Local Toll Authority.