IH 20 Eastbound FR over S Robinson RD & Fish Crk
GoodDallas County, Texas · IH 20 @ Robinson Road · Structure no. 180570237404626
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 960 ft
- 8 main spans
- Daily traffic
- 11,127
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
IH 20 Eastbound FR over S Robinson RD & Fish Crk is a prestressed concrete stringer/multi-beam or girder carrying IH 20 Eastbound FR over S Robinson RD & Fish Crk in Dallas County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,127 vehicles a day, roughly 6% of them trucks, projected to reach 15,578 by 2044. The structure is 960 ft (292.6 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 20 Eastbound FR over S Robinson RD & Fish Crk built?
It was built in 2021, making it 4 years old in 2025.
What condition is IH 20 Eastbound FR over S Robinson RD & Fish Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does IH 20 Eastbound FR over S Robinson RD & Fish Crk carry?
About 11,127 vehicles per day (2020 count), of which roughly 6% are trucks.
How long is IH 20 Eastbound FR over S Robinson RD & Fish Crk?
The structure is 960 ft (292.6 m) long with a longest span of 135 ft (41.1 m) and a deck 30 ft wide.
Who owns IH 20 Eastbound FR over S Robinson RD & Fish Crk?
It is owned by the State Highway Agency.