IH 20 EB Entrance over Fish Creek
FairDallas County, Texas · IH 20 @ Robinson Road · Structure no. 180570237404625
- Built
- 2021
- 4 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 278 ft
- 3 main spans
- Daily traffic
- 11,127
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
IH 20 EB Entrance over Fish Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 20 EB Entrance over Fish Creek in Dallas County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,127 vehicles a day, roughly 6% of them trucks, projected to reach 15,578 by 2044. The structure is 278 ft (84.7 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 20 EB Entrance over Fish Creek built?
It was built in 2021, making it 4 years old in 2025.
What condition is IH 20 EB Entrance over Fish Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does IH 20 EB Entrance over Fish Creek carry?
About 11,127 vehicles per day (2020 count), of which roughly 6% are trucks.
How long is IH 20 EB Entrance over Fish Creek?
The structure is 278 ft (84.7 m) long with a longest span of 95 ft (29 m) and a deck 28 ft wide.
Who owns IH 20 EB Entrance over Fish Creek?
It is owned by the State Highway Agency.