IH 20 WB Off Ramp over SH 310
FairDallas County, Texas · 3.4 MI E of SH 342 · Structure no. 180570237403305
- Built
- 1973
- 52 years old, rebuilt 2019
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 203 ft
- 3 main spans
- Daily traffic
- 6,017
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
IH 20 WB Off Ramp over SH 310 is a steel continuous stringer/multi-beam or girder carrying IH 20 WB Off Ramp over SH 310 in Dallas County, Texas. It was built in 1973 and reconstructed in 2019, so it is 52 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,017 vehicles a day, projected to reach 8,424 by 2040. The structure is 203 ft (61.9 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 20 WB Off Ramp over SH 310 built?
It was built in 1973, making it 52 years old in 2025. It was reconstructed in 2019.
What condition is IH 20 WB Off Ramp over SH 310 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does IH 20 WB Off Ramp over SH 310 carry?
About 6,017 vehicles per day (2019 count).
How long is IH 20 WB Off Ramp over SH 310?
The structure is 203 ft (61.9 m) long with a longest span of 99 ft (30.2 m) and a deck 26 ft wide.
Who owns IH 20 WB Off Ramp over SH 310?
It is owned by the State Highway Agency.