IH 635 NB over S Mesquite Creek
GoodDallas County, Texas · 4.0 MI N of Elam RD · Structure no. 180570237402134
- Built
- 1971
- 54 years old
- Condition
- Good
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 180 ft
- 3 main spans
- Daily traffic
- 91,008
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
IH 635 NB over S Mesquite Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 635 NB over S Mesquite Creek in Dallas County, Texas. It was built in 1971, so it is 54 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 91,008 vehicles a day, roughly 13% of them trucks, projected to reach 111,880 by 2033. The structure is 180 ft (54.9 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 635 NB over S Mesquite Creek built?
It was built in 1971, making it 54 years old in 2025.
What condition is IH 635 NB over S Mesquite Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does IH 635 NB over S Mesquite Creek carry?
About 91,008 vehicles per day (2023 count), of which roughly 13% are trucks.
How long is IH 635 NB over S Mesquite Creek?
The structure is 180 ft (54.9 m) long with a longest span of 60 ft (18.3 m) and a deck 70 ft wide.
Who owns IH 635 NB over S Mesquite Creek?
It is owned by the State Highway Agency.