IH 635 Mngd Lanes over Josey Lane
FairDallas County, Texas · IH 635 @ Josey LN · Structure no. 180570237401548
- Built
- 2014
- 11 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 2,155 ft
- 20 main spans
- Daily traffic
- 500
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
IH 635 Mngd Lanes over Josey Lane is a prestressed concrete stringer/multi-beam or girder carrying IH 635 Mngd Lanes over Josey Lane in Dallas County, Texas. It was built in 2014, so it is 11 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 500 vehicles a day, roughly 10% of them trucks, projected to reach 500 by 2035. The structure is 2,155 ft (656.8 m) long and 76 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 635 Mngd Lanes over Josey Lane built?
It was built in 2014, making it 11 years old in 2025.
What condition is IH 635 Mngd Lanes over Josey Lane in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does IH 635 Mngd Lanes over Josey Lane carry?
About 500 vehicles per day (2015 count), of which roughly 10% are trucks.
How long is IH 635 Mngd Lanes over Josey Lane?
The structure is 2,155 ft (656.8 m) long with a longest span of 125 ft (38.1 m) and a deck 76 ft wide.
Who owns IH 635 Mngd Lanes over Josey Lane?
It is owned by the State Highway Agency and maintained by the Private (other than railroad).