US Bridges

Webb Chapel RD SB over IH 635 Mngd Lanes

Good

Dallas County, Texas · IH 635 @ Webb Chapel RD · Structure no. 180570237401537

Built
2014
11 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
121 ft
2 main spans
Daily traffic
10,305
2019 count
Owner
State
State Highway Agency

About this bridge

Webb Chapel RD SB over IH 635 Mngd Lanes is a prestressed concrete stringer/multi-beam or girder carrying Webb Chapel RD SB over IH 635 Mngd Lanes in Dallas County, Texas. It was built in 2014, so it is 11 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,305 vehicles a day, roughly 10% of them trucks, projected to reach 500 by 2035. The structure is 121 ft (36.9 m) long and 93 ft wide.

CarriesWebb Chapel RD SB
CrossesIH 635 Mngd Lanes
LocationIH 635 @ Webb Chapel RD
RouteCity Street 0
StateTexas
Coordinates32.91277, -96.87324
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length121 ft (36.9 m)
Longest span59 ft (18 m)
Deck width93 ft (28.2 m)
Roadway width71 ft (21.6 m)
Vertical clearance over deck17 ft (5.1 m)

Traffic and service

Average daily traffic10,305 (2019)
Projected traffic500 by 2035
Trucks10%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Webb Chapel RD SB over IH 635 Mngd Lanes built?

It was built in 2014, making it 11 years old in 2025.

What condition is Webb Chapel RD SB over IH 635 Mngd Lanes in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Webb Chapel RD SB over IH 635 Mngd Lanes carry?

About 10,305 vehicles per day (2019 count), of which roughly 10% are trucks.

How long is Webb Chapel RD SB over IH 635 Mngd Lanes?

The structure is 121 ft (36.9 m) long with a longest span of 59 ft (18 m) and a deck 93 ft wide.

Who owns Webb Chapel RD SB over IH 635 Mngd Lanes?

It is owned by the State Highway Agency and maintained by the Private (other than railroad).