IH635 Wbfr/Off Rmp over Josey Lane
GoodDallas County, Texas · 1 MI East of IH-35E · Structure no. 180570237401536
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 359 ft
- 3 main spans
- Daily traffic
- 16,500
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
IH635 Wbfr/Off Rmp over Josey Lane is a prestressed concrete stringer/multi-beam or girder carrying IH635 Wbfr/Off Rmp over Josey Lane in Dallas County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 16,500 vehicles a day, roughly 10% of them trucks, projected to reach 99,999 by 2033. The structure is 359 ft (109.4 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH635 Wbfr/Off Rmp over Josey Lane built?
It was built in 2013, making it 12 years old in 2025.
What condition is IH635 Wbfr/Off Rmp over Josey Lane in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does IH635 Wbfr/Off Rmp over Josey Lane carry?
About 16,500 vehicles per day (2013 count), of which roughly 10% are trucks.
How long is IH635 Wbfr/Off Rmp over Josey Lane?
The structure is 359 ft (109.4 m) long with a longest span of 125 ft (38.1 m) and a deck 28 ft wide.
Who owns IH635 Wbfr/Off Rmp over Josey Lane?
It is owned by the State Highway Agency and maintained by the Private (other than railroad).