Valley View Lane over IH 635 Mngd Lanes
GoodDallas County, Texas · 0.15 MI SW of Midway RD · Structure no. 180570237401526
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 126 ft
- 2 main spans
- Daily traffic
- 260,970
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Valley View Lane over IH 635 Mngd Lanes is a prestressed concrete stringer/multi-beam or girder carrying Valley View Lane over IH 635 Mngd Lanes in Dallas County, Texas. It was built in 2014, so it is 11 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 260,970 vehicles a day, roughly 10% of them trucks, projected to reach 500 by 2035. The structure is 126 ft (38.4 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Valley View Lane over IH 635 Mngd Lanes built?
It was built in 2014, making it 11 years old in 2025.
What condition is Valley View Lane over IH 635 Mngd Lanes in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does Valley View Lane over IH 635 Mngd Lanes carry?
About 260,970 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is Valley View Lane over IH 635 Mngd Lanes?
The structure is 126 ft (38.4 m) long with a longest span of 61 ft (18.6 m) and a deck 41 ft wide.
Who owns Valley View Lane over IH 635 Mngd Lanes?
It is owned by the State Highway Agency and maintained by the Private (other than railroad).