US Bridges

IH 35 E NB over Reunion Blvd

Good

Dallas County, Texas · 0.35 MI N of IH 30 · Structure no. 180570106804533

Built
2016
9 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
216 ft
3 main spans
Daily traffic
104,372
2019 count
Owner
State
State Highway Agency

About this bridge

IH 35 E NB over Reunion Blvd is a prestressed concrete stringer/multi-beam or girder carrying IH 35 E NB over Reunion Blvd in Dallas County, Texas. It was built in 2016, so it is 9 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 104,372 vehicles a day, roughly 7% of them trucks, projected to reach 155,170 by 2031. The structure is 216 ft (65.8 m) long and 115 ft wide.

CarriesIH 35 E NB
CrossesReunion Blvd
Location0.35 MI N of IH 30
RouteInterstate 35
StateTexas
Coordinates32.77505, -96.81099
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHL 93
Structure length216 ft (65.8 m)
Longest span113 ft (34.4 m)
Deck width115 ft (35.1 m)
Roadway width114 ft (34.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic104,372 (2019)
Projected traffic155,170 by 2031
Trucks7%
Lanes on structure6
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 35 E NB over Reunion Blvd built?

It was built in 2016, making it 9 years old in 2025.

What condition is IH 35 E NB over Reunion Blvd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does IH 35 E NB over Reunion Blvd carry?

About 104,372 vehicles per day (2019 count), of which roughly 7% are trucks.

How long is IH 35 E NB over Reunion Blvd?

The structure is 216 ft (65.8 m) long with a longest span of 113 ft (34.4 m) and a deck 115 ft wide.

Who owns IH 35 E NB over Reunion Blvd?

It is owned by the State Highway Agency.