US Bridges

Ewing Avenue over IH 35E

Good

Dallas County, Texas · 2.1 MI N of Illinois Ave · Structure no. 180570044202431

Built
2021
4 years old
Condition
Good
inspected January 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
293 ft
2 main spans
Daily traffic
2,000
2017 count
Owner
State
State Highway Agency

About this bridge

Ewing Avenue over IH 35E is a prestressed concrete stringer/multi-beam or girder carrying Ewing Avenue over IH 35E in Dallas County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,000 vehicles a day, roughly 10% of them trucks, projected to reach 3,000 by 2035. The structure is 293 ft (89.4 m) long and 108 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEwing Avenue
CrossesIH 35E
Location2.1 MI N of Illinois Ave
RouteCity Street 0
StateTexas
Coordinates32.74561, -96.81277
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length293 ft (89.4 m)
Longest span167 ft (51 m)
Deck width108 ft (32.9 m)
Roadway width79 ft (24.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,000 (2017)
Projected traffic3,000 by 2035
Trucks10%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ewing Avenue over IH 35E built?

It was built in 2021, making it 4 years old in 2025.

What condition is Ewing Avenue over IH 35E in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does Ewing Avenue over IH 35E carry?

About 2,000 vehicles per day (2017 count), of which roughly 10% are trucks.

How long is Ewing Avenue over IH 35E?

The structure is 293 ft (89.4 m) long with a longest span of 167 ft (51 m) and a deck 108 ft wide.

Who owns Ewing Avenue over IH 35E?

It is owned by the State Highway Agency.