IH 35E SB over Wheatland RD
FairDallas County, Texas · 0.4 MI N of IH 20 · Structure no. 180570044202070
- Built
- 1964
- 61 years old, rebuilt 1974
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 127 ft
- 1 main span
- Daily traffic
- 58,666
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35E SB over Wheatland RD is a prestressed concrete stringer/multi-beam or girder carrying IH 35E SB over Wheatland RD in Dallas County, Texas. It was built in 1964 and reconstructed in 1974, so it is 61 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 58,666 vehicles a day, roughly 12% of them trucks, projected to reach 110,243 by 2040. The structure is 127 ft (38.7 m) long and 68 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35E SB over Wheatland RD built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 1974.
What condition is IH 35E SB over Wheatland RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does IH 35E SB over Wheatland RD carry?
About 58,666 vehicles per day (2023 count), of which roughly 12% are trucks.
How long is IH 35E SB over Wheatland RD?
The structure is 127 ft (38.7 m) long with a longest span of 58 ft (17.7 m) and a deck 68 ft wide.
Who owns IH 35E SB over Wheatland RD?
It is owned by the State Highway Agency.