US Bridges

SH 352 over UP RR / Scyene RD

Fair

Dallas County, Texas · 0.9 MI E of Bryan RD · Structure no. 180570043001010

Built
1999
26 years old
Condition
Fair
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
430 ft
3 main spans
Daily traffic
10,911
2023 count
Owner
State
State Highway Agency

About this bridge

SH 352 over UP RR / Scyene RD is a prestressed concrete stringer/multi-beam or girder carrying SH 352 over UP RR / Scyene RD in Dallas County, Texas. It was built in 1999, so it is 26 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 10,911 vehicles a day, roughly 9% of them trucks, projected to reach 21,580 by 2033. The structure is 430 ft (131.1 m) long and 66 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSH 352
CrossesUP RR / Scyene RD
Location0.9 MI E of Bryan RD
RouteState Highway 352
StateTexas
Coordinates32.76566, -96.58026
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3 (+1 approach)
Design loadHS 20
Structure length430 ft (131.1 m)
Longest span122 ft (37.2 m)
Deck width66 ft (20.1 m)
Roadway width52 ft (15.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,911 (2023)
Projected traffic21,580 by 2033
Trucks9%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 352 over UP RR / Scyene RD built?

It was built in 1999, making it 26 years old in 2025.

What condition is SH 352 over UP RR / Scyene RD in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does SH 352 over UP RR / Scyene RD carry?

About 10,911 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is SH 352 over UP RR / Scyene RD?

The structure is 430 ft (131.1 m) long with a longest span of 122 ft (37.2 m) and a deck 66 ft wide.

Who owns SH 352 over UP RR / Scyene RD?

It is owned by the State Highway Agency.