SH 352 EB over White Rock Creek
FairDallas County, Texas · 0.7 MI W of Lawnview · Structure no. 180570043001001
- Built
- 1931
- 94 years old, rebuilt 1965
- Condition
- Fair
- inspected December 2023
- Type
- Tee Beam
- Concrete
- Length
- 238 ft
- 9 main spans
- Daily traffic
- 8,588
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SH 352 EB over White Rock Creek is a concrete tee beam carrying SH 352 EB over White Rock Creek in Dallas County, Texas. It was built in 1931 and reconstructed in 1965, so it is 94 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,588 vehicles a day, roughly 6% of them trucks, projected to reach 10,070 by 2033. The structure is 238 ft (72.5 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 352 EB over White Rock Creek built?
It was built in 1931, making it 94 years old in 2025. It was reconstructed in 1965.
What condition is SH 352 EB over White Rock Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does SH 352 EB over White Rock Creek carry?
About 8,588 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is SH 352 EB over White Rock Creek?
The structure is 238 ft (72.5 m) long with a longest span of 26 ft (7.9 m) and a deck 49 ft wide.
Who owns SH 352 EB over White Rock Creek?
It is owned by the State Highway Agency.