US Bridges

SH114EB to LP12 SB over Lp 12

Good

Dallas County, Texas · SH114/ LP12 Interchange · Structure no. 180570035306358

Built
2012
13 years old
Condition
Good
inspected January 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,443 ft
12 main spans
Daily traffic
9,500
2015 count
Owner
State
State Highway Agency

About this bridge

SH114EB to LP12 SB over Lp 12 is a prestressed concrete stringer/multi-beam or girder carrying SH114EB to LP12 SB over Lp 12 in Dallas County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,500 vehicles a day, roughly 8% of them trucks, projected to reach 16,300 by 2035. The structure is 1,443 ft (439.8 m) long and 28 ft wide.

CarriesSH114EB to LP12 SB
CrossesLp 12
LocationSH114/ LP12 Interchange
RouteState Highway 114
StateTexas
Coordinates32.8466, -96.91356
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans12
Design loadHS 20
Structure length1,443 ft (439.8 m)
Longest span131 ft (39.9 m)
Deck width28 ft (8.5 m)
Roadway width25 ft (7.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,500 (2015)
Projected traffic16,300 by 2035
Trucks8%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH114EB to LP12 SB over Lp 12 built?

It was built in 2012, making it 13 years old in 2025.

What condition is SH114EB to LP12 SB over Lp 12 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does SH114EB to LP12 SB over Lp 12 carry?

About 9,500 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is SH114EB to LP12 SB over Lp 12?

The structure is 1,443 ft (439.8 m) long with a longest span of 131 ft (39.9 m) and a deck 28 ft wide.

Who owns SH114EB to LP12 SB over Lp 12?

It is owned by the State Highway Agency.