US Bridges

SH 114 Express over SH 114 to Spur 348 EB

Good

Dallas County, Texas · 1.5 MI SE of Pgbt · Structure no. 180570035304509

Built
2017
8 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
454 ft
4 main spans
Daily traffic
16,400
2016 count
Owner
State
State Highway Agency

About this bridge

SH 114 Express over SH 114 to Spur 348 EB is a prestressed concrete stringer/multi-beam or girder carrying SH 114 Express over SH 114 to Spur 348 EB in Dallas County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,400 vehicles a day, roughly 7% of them trucks, projected to reach 23,400 by 2028. The structure is 454 ft (138.4 m) long and 52 ft wide.

CarriesSH 114 Express
CrossesSH 114 to Spur 348 EB
Location1.5 MI SE of Pgbt
RouteState Highway 114
StateTexas
Coordinates32.88174, -96.94877
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans4
Design loadHL 93
Structure length454 ft (138.4 m)
Longest span127 ft (38.7 m)
Deck width52 ft (15.9 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deck27 ft (8.1 m)

Traffic and service

Average daily traffic16,400 (2016)
Projected traffic23,400 by 2028
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 114 Express over SH 114 to Spur 348 EB built?

It was built in 2017, making it 8 years old in 2025.

What condition is SH 114 Express over SH 114 to Spur 348 EB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does SH 114 Express over SH 114 to Spur 348 EB carry?

About 16,400 vehicles per day (2016 count), of which roughly 7% are trucks.

How long is SH 114 Express over SH 114 to Spur 348 EB?

The structure is 454 ft (138.4 m) long with a longest span of 127 ft (38.7 m) and a deck 52 ft wide.

Who owns SH 114 Express over SH 114 to Spur 348 EB?

It is owned by the State Highway Agency.