US Bridges

SH 114 over Grapevine Creek

Good

Dallas County, Texas · 4.1 MI NW of SH 161 · Structure no. 180570035304467

Built
2013
12 years old
Condition
Good
inspected January 2024
Type
Culvert
Concrete
Length
96 ft
9 main spans
Daily traffic
129,066
2023 count
Owner
State
State Highway Agency

About this bridge

SH 114 over Grapevine Creek is a concrete culvert carrying SH 114 over Grapevine Creek in Dallas County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 129,066 vehicles a day, roughly 7% of them trucks, projected to reach 126,900 by 2031. The structure is 96 ft (29.3 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH 114
CrossesGrapevine Creek
Location4.1 MI NW of SH 161
RouteState Highway 114
StateTexas
Coordinates32.92806, -97.0302
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans9
Design loadHL 93
Structure length96 ft (29.3 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic129,066 (2023)
Projected traffic126,900 by 2031
Trucks7%
Lanes on structure12
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 114 over Grapevine Creek built?

It was built in 2013, making it 12 years old in 2025.

What condition is SH 114 over Grapevine Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does SH 114 over Grapevine Creek carry?

About 129,066 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is SH 114 over Grapevine Creek?

The structure is 96 ft (29.3 m) long with a longest span of 10 ft (3 m).

Who owns SH 114 over Grapevine Creek?

It is owned by the State Highway Agency.