US Bridges

US 67 Nbml over Hampton RD

Fair

Dallas County, Texas · 2.05 MI NE of IH 20 · Structure no. 180570026103022

Built
1969
56 years old, rebuilt 2000
Condition
Fair
inspected January 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
343 ft
4 main spans
Daily traffic
44,989
2022 count
Owner
State
State Highway Agency

About this bridge

US 67 Nbml over Hampton RD is a steel continuous stringer/multi-beam or girder carrying US 67 Nbml over Hampton RD in Dallas County, Texas. It was built in 1969 and reconstructed in 2000, so it is 56 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 44,989 vehicles a day, roughly 4% of them trucks, projected to reach 55,630 by 2033. The structure is 343 ft (104.5 m) long and 95 ft wide.

CarriesUS 67 Nbml
CrossesHampton RD
Location2.05 MI NE of IH 20
RouteU.S. Route 67
StateTexas
Coordinates32.67635, -96.85708
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating31 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length343 ft (104.5 m)
Longest span94 ft (28.7 m)
Deck width95 ft (28.9 m)
Roadway width90 ft (27.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic44,989 (2022)
Projected traffic55,630 by 2033
Trucks4%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$33,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 67 Nbml over Hampton RD built?

It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2000.

What condition is US 67 Nbml over Hampton RD in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does US 67 Nbml over Hampton RD carry?

About 44,989 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is US 67 Nbml over Hampton RD?

The structure is 343 ft (104.5 m) long with a longest span of 94 ft (28.7 m) and a deck 95 ft wide.

Who owns US 67 Nbml over Hampton RD?

It is owned by the State Highway Agency.