US Bridges

IH-35E SB on Ramp over Right of Way

Good

Dallas County, Texas · 2.5 MI S. of GWB/I35E JCT · Structure no. 180570019603482

Built
2018
7 years old
Condition
Good
inspected November 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
387 ft
3 main spans
Daily traffic
14,841
2017 count
Owner
State
State Highway Agency

About this bridge

IH-35E SB on Ramp over Right of Way is a prestressed concrete stringer/multi-beam or girder carrying IH-35E SB on Ramp over Right of Way in Dallas County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,841 vehicles a day, roughly 87% of them trucks, projected to reach 20,778 by 2037. The structure is 387 ft (118 m) long and 28 ft wide.

CarriesIH-35E SB on Ramp
CrossesRight of Way
Location2.5 MI S. of GWB/I35E JCT
RouteInterstate 35
StateTexas
Coordinates32.95042, -96.90913
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHL 93
Structure length387 ft (118 m)
Longest span129 ft (39.3 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,841 (2017)
Projected traffic20,778 by 2037
Trucks87%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH-35E SB on Ramp over Right of Way built?

It was built in 2018, making it 7 years old in 2025.

What condition is IH-35E SB on Ramp over Right of Way in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.

How much traffic does IH-35E SB on Ramp over Right of Way carry?

About 14,841 vehicles per day (2017 count), of which roughly 87% are trucks.

How long is IH-35E SB on Ramp over Right of Way?

The structure is 387 ft (118 m) long with a longest span of 129 ft (39.3 m) and a deck 28 ft wide.

Who owns IH-35E SB on Ramp over Right of Way?

It is owned by the State Highway Agency.