IH 20 EB over Lumley RD & Draw
FairDallas County, Texas · 4.2 MI E of IH 635 · Structure no. 180570009513171
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 555 ft
- 5 main spans
- Daily traffic
- 34,604
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
IH 20 EB over Lumley RD & Draw is a prestressed concrete stringer/multi-beam or girder carrying IH 20 EB over Lumley RD & Draw in Dallas County, Texas. It was built in 1988, so it is 37 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 34,604 vehicles a day, roughly 21% of them trucks, projected to reach 44,293 by 2040. The structure is 555 ft (169.2 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 20 EB over Lumley RD & Draw built?
It was built in 1988, making it 37 years old in 2025.
What condition is IH 20 EB over Lumley RD & Draw in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does IH 20 EB over Lumley RD & Draw carry?
About 34,604 vehicles per day (2023 count), of which roughly 21% are trucks.
How long is IH 20 EB over Lumley RD & Draw?
The structure is 555 ft (169.2 m) long with a longest span of 100 ft (30.5 m) and a deck 54 ft wide.
Who owns IH 20 EB over Lumley RD & Draw?
It is owned by the State Highway Agency.