IH 45 NB Entr Ramp over Five Mile Creek Relief 1
FairDallas County, Texas · 1.9 MI N of IH 20 · Structure no. 180570009214231
- Built
- 1974
- 51 years old
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 222 ft
- 3 main spans
- Daily traffic
- 6,650
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
IH 45 NB Entr Ramp over Five Mile Creek Relief 1 is a prestressed concrete stringer/multi-beam or girder carrying IH 45 NB Entr Ramp over Five Mile Creek Relief 1 in Dallas County, Texas. It was built in 1974, so it is 51 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,650 vehicles a day, roughly 18% of them trucks, projected to reach 9,320 by 2033. The structure is 222 ft (67.7 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 45 NB Entr Ramp over Five Mile Creek Relief 1 built?
It was built in 1974, making it 51 years old in 2025.
What condition is IH 45 NB Entr Ramp over Five Mile Creek Relief 1 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does IH 45 NB Entr Ramp over Five Mile Creek Relief 1 carry?
About 6,650 vehicles per day (2013 count), of which roughly 18% are trucks.
How long is IH 45 NB Entr Ramp over Five Mile Creek Relief 1?
The structure is 222 ft (67.7 m) long with a longest span of 74 ft (22.6 m) and a deck 26 ft wide.
Who owns IH 45 NB Entr Ramp over Five Mile Creek Relief 1?
It is owned by the State Highway Agency.