US Bridges

US 75 NB & SB FR over Spring Valley Road

Good

Dallas County, Texas · US 75 @ Spring Valley RD · Structure no. 180570004707419

Built
2004
21 years old
Condition
Good
inspected March 2022
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
58 ft
1 main span
Daily traffic
15,530
2019 count
Owner
State
State Highway Agency

About this bridge

US 75 NB & SB FR over Spring Valley Road is a prestressed concrete box beam or girders - multiple carrying US 75 NB & SB FR over Spring Valley Road in Dallas County, Texas. It was built in 2004, so it is 21 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,530 vehicles a day, roughly 5% of them trucks, projected to reach 60,000 by 2038. The structure is 58 ft (17.7 m) long and 750 ft wide.

CarriesUS 75 NB & SB FR
CrossesSpring Valley Road
LocationUS 75 @ Spring Valley RD
RouteU.S. Route 75
StateTexas
Coordinates32.94012, -96.74649
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length58 ft (17.7 m)
Longest span57 ft (17.4 m)
Deck width750 ft (228.6 m)
Roadway width748 ft (228 m)
Vertical clearance over deck17 ft (5.1 m)

Traffic and service

Average daily traffic15,530 (2019)
Projected traffic60,000 by 2038
Trucks5%
Lanes on structure10
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$14,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 75 NB & SB FR over Spring Valley Road built?

It was built in 2004, making it 21 years old in 2025.

What condition is US 75 NB & SB FR over Spring Valley Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.

How much traffic does US 75 NB & SB FR over Spring Valley Road carry?

About 15,530 vehicles per day (2019 count), of which roughly 5% are trucks.

How long is US 75 NB & SB FR over Spring Valley Road?

The structure is 58 ft (17.7 m) long with a longest span of 57 ft (17.4 m) and a deck 750 ft wide.

Who owns US 75 NB & SB FR over Spring Valley Road?

It is owned by the State Highway Agency.