US Bridges

US 75 SB over Arapaho RD

Good

Dallas County, Texas · 3.80 MI NE of IH 635 · Structure no. 180570004707278

Built
1990
35 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
387 ft
3 main spans
Daily traffic
116,919
2023 count
Owner
State
State Highway Agency

About this bridge

US 75 SB over Arapaho RD is a prestressed concrete stringer/multi-beam or girder carrying US 75 SB over Arapaho RD in Dallas County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 116,919 vehicles a day, roughly 6% of them trucks, projected to reach 153,820 by 2033. The structure is 387 ft (118 m) long and 85 ft wide.

CarriesUS 75 SB
CrossesArapaho RD
Location3.80 MI NE of IH 635
RouteU.S. Route 75
StateTexas
Coordinates32.96078, -96.72783
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length387 ft (118 m)
Longest span138 ft (42.1 m)
Deck width85 ft (25.9 m)
Roadway width82 ft (25.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic116,919 (2023)
Projected traffic153,820 by 2033
Trucks6%
Lanes on structure6
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US 75 SB over Arapaho RD built?

It was built in 1990, making it 35 years old in 2025.

What condition is US 75 SB over Arapaho RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does US 75 SB over Arapaho RD carry?

About 116,919 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is US 75 SB over Arapaho RD?

The structure is 387 ft (118 m) long with a longest span of 138 ft (42.1 m) and a deck 85 ft wide.

Who owns US 75 SB over Arapaho RD?

It is owned by the State Highway Agency.