IH30WB to IH635SB over IH 635 & IH 30
FairDallas County, Texas · IH30 & IH 635 Interchange · Structure no. 180570000911518
- Built
- 2023
- 2 years old
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 2,878 ft
- 4 main spans
- Daily traffic
- 29,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
IH30WB to IH635SB over IH 635 & IH 30 is a steel continuous stringer/multi-beam or girder carrying IH30WB to IH635SB over IH 635 & IH 30 in Dallas County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 29,000 vehicles a day, roughly 15% of them trucks, projected to reach 1 by 1900. The structure is 2,878 ft (877.2 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH30WB to IH635SB over IH 635 & IH 30 built?
It was built in 2023, making it 2 years old in 2025.
What condition is IH30WB to IH635SB over IH 635 & IH 30 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does IH30WB to IH635SB over IH 635 & IH 30 carry?
About 29,000 vehicles per day (2022 count), of which roughly 15% are trucks.
How long is IH30WB to IH635SB over IH 635 & IH 30?
The structure is 2,878 ft (877.2 m) long with a longest span of 248 ft (75.6 m) and a deck 38 ft wide.
Who owns IH30WB to IH635SB over IH 635 & IH 30?
It is owned by the State Highway Agency.