IH 30 EB Ml & FR over Duck Creek Relief
GoodDallas County, Texas · 1.7 Mi. NE of IH 635 · Structure no. 180570000911454
- Built
- 1999
- 26 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 270 ft
- 3 main spans
- Daily traffic
- 74,801
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
IH 30 EB Ml & FR over Duck Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying IH 30 EB Ml & FR over Duck Creek Relief in Dallas County, Texas. It was built in 1999, so it is 26 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 74,801 vehicles a day, roughly 11% of them trucks, projected to reach 102,970 by 2033. The structure is 270 ft (82.3 m) long and 108 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 30 EB Ml & FR over Duck Creek Relief built?
It was built in 1999, making it 26 years old in 2025.
What condition is IH 30 EB Ml & FR over Duck Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does IH 30 EB Ml & FR over Duck Creek Relief carry?
About 74,801 vehicles per day (2019 count), of which roughly 11% are trucks.
How long is IH 30 EB Ml & FR over Duck Creek Relief?
The structure is 270 ft (82.3 m) long with a longest span of 90 ft (27.4 m) and a deck 108 ft wide.
Who owns IH 30 EB Ml & FR over Duck Creek Relief?
It is owned by the State Highway Agency.