Griffin ST West over IH 30 Work Area
FairDallas County, Texas · 0.7 MI SW of IH 45 · Structure no. 180570000911395
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected April 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 62 ft
- 2 main spans
- Daily traffic
- 9,403
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
Griffin ST West over IH 30 Work Area is a concrete continuous tee beam carrying Griffin ST West over IH 30 Work Area in Dallas County, Texas. It was built in 1965, so it is 60 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,403 vehicles a day, projected to reach 16,925 by 2036. The structure is 62 ft (18.9 m) long and 57 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Griffin ST West over IH 30 Work Area built?
It was built in 1965, making it 60 years old in 2025.
What condition is Griffin ST West over IH 30 Work Area in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Griffin ST West over IH 30 Work Area carry?
About 9,403 vehicles per day (2016 count).
How long is Griffin ST West over IH 30 Work Area?
The structure is 62 ft (18.9 m) long with a longest span of 49 ft (14.9 m) and a deck 57 ft wide.
Who owns Griffin ST West over IH 30 Work Area?
It is owned by the State Highway Agency.