IH 30 EB Off-Ramp over White Rock Draw
FairDallas County, Texas · 2.8 MI W of Loop 12 · Structure no. 180570000911389
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 355 ft
- 8 main spans
- Daily traffic
- 15,110
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
IH 30 EB Off-Ramp over White Rock Draw is a prestressed concrete stringer/multi-beam or girder carrying IH 30 EB Off-Ramp over White Rock Draw in Dallas County, Texas. It was built in 1962, so it is 63 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,110 vehicles a day, roughly 8% of them trucks, projected to reach 21,150 by 2033. The structure is 355 ft (108.2 m) long and 22 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 30 EB Off-Ramp over White Rock Draw built?
It was built in 1962, making it 63 years old in 2025.
What condition is IH 30 EB Off-Ramp over White Rock Draw in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does IH 30 EB Off-Ramp over White Rock Draw carry?
About 15,110 vehicles per day (2013 count), of which roughly 8% are trucks.
How long is IH 30 EB Off-Ramp over White Rock Draw?
The structure is 355 ft (108.2 m) long with a longest span of 44 ft (13.4 m) and a deck 22 ft wide.
Who owns IH 30 EB Off-Ramp over White Rock Draw?
It is owned by the State Highway Agency.