US Bridges

FM 116 SB over SH 9

Good

Coryell County, Texas · 1.07 MI North of FM 1113 · Structure no. 090500362301006

Built
2023
2 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
245 ft
3 main spans
Daily traffic
11,617
2022 count
Owner
State
State Highway Agency

About this bridge

FM 116 SB over SH 9 is a prestressed concrete stringer/multi-beam or girder carrying FM 116 SB over SH 9 in Coryell County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,617 vehicles a day, roughly 4% of them trucks, projected to reach 15,000 by 2023. The structure is 245 ft (74.7 m) long and 40 ft wide.

CarriesFM 116 SB
CrossesSH 9
Location1.07 MI North of FM 1113
RouteState Highway 116
StateTexas
Coordinates31.14129, -97.90098
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length245 ft (74.7 m)
Longest span85 ft (25.9 m)
Deck width40 ft (12.3 m)
Roadway width38 ft (11.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,617 (2022)
Projected traffic15,000 by 2023
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FM 116 SB over SH 9 built?

It was built in 2023, making it 2 years old in 2025.

What condition is FM 116 SB over SH 9 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does FM 116 SB over SH 9 carry?

About 11,617 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is FM 116 SB over SH 9?

The structure is 245 ft (74.7 m) long with a longest span of 85 ft (25.9 m) and a deck 40 ft wide.

Who owns FM 116 SB over SH 9?

It is owned by the State Highway Agency.