US Bridges

FM 922 over Draw

Good

Cooke County, Texas · 0.1 MI W of SH 51 · Structure no. 030490084503022

Built
2001
24 years old
Condition
Good
inspected January 2024
Type
Culvert
Concrete
Length
21 ft
2 main spans
Daily traffic
2,285
2020 count
Owner
State
State Highway Agency

About this bridge

FM 922 over Draw is a concrete culvert carrying FM 922 over Draw in Cooke County, Texas. It was built in 2001, so it is 24 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,285 vehicles a day, roughly 9% of them trucks, projected to reach 2,879 by 2040. The structure is 21 ft (6.4 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFM 922
CrossesDraw
Location0.1 MI W of SH 51
RouteState Highway 922
StateTexas
Coordinates33.49534, -97.28527
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length21 ft (6.4 m)
Longest span8 ft (2.4 m)
Deck width50 ft (15.2 m)
Roadway width41 ft (12.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,285 (2020)
Projected traffic2,879 by 2040
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 922 over Draw built?

It was built in 2001, making it 24 years old in 2025.

What condition is FM 922 over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does FM 922 over Draw carry?

About 2,285 vehicles per day (2020 count), of which roughly 9% are trucks.

How long is FM 922 over Draw?

The structure is 21 ft (6.4 m) long with a longest span of 8 ft (2.4 m) and a deck 50 ft wide.

Who owns FM 922 over Draw?

It is owned by the State Highway Agency.