IH 35 NB over Spring Creek Relief
FairCooke County, Texas · 1.3 MI S of FM 922 · Structure no. 030490019501106
- Built
- 1963
- 62 years old, rebuilt 1991
- Condition
- Fair
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 150 ft
- 3 main spans
- Daily traffic
- 26,003
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35 NB over Spring Creek Relief is a steel continuous stringer/multi-beam or girder carrying IH 35 NB over Spring Creek Relief in Cooke County, Texas. It was built in 1963 and reconstructed in 1991, so it is 62 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 26,003 vehicles a day, roughly 12% of them trucks, projected to reach 39,004 by 2042. The structure is 150 ft (45.7 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35 NB over Spring Creek Relief built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1991.
What condition is IH 35 NB over Spring Creek Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does IH 35 NB over Spring Creek Relief carry?
About 26,003 vehicles per day (2022 count), of which roughly 12% are trucks.
How long is IH 35 NB over Spring Creek Relief?
The structure is 150 ft (45.7 m) long with a longest span of 50 ft (15.2 m) and a deck 40 ft wide.
Who owns IH 35 NB over Spring Creek Relief?
It is owned by the State Highway Agency.