US Bridges

CR 360 over Leon River

Fair

Comanche County, Texas · 2.25 MI SW of FM 591 · Structure no. 230470AA0389001

Built
2000
25 years old
Condition
Fair
inspected February 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
122 ft
3 main spans
Daily traffic
110
2013 count
Owner
County
County Highway Agency

About this bridge

CR 360 over Leon River is a concrete stringer/multi-beam or girder carrying CR 360 over Leon River in Comanche County, Texas. It was built in 2000, so it is 25 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 110 vehicles a day, projected to reach 170 by 2033. The structure is 122 ft (37.2 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCR 360
CrossesLeon River
Location2.25 MI SW of FM 591
RouteCounty Highway 360
StateTexas
Coordinates31.8642, -98.35688
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length122 ft (37.2 m)
Longest span41 ft (12.5 m)
Deck width26 ft (7.8 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic110 (2013)
Projected traffic170 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 360 over Leon River built?

It was built in 2000, making it 25 years old in 2025.

What condition is CR 360 over Leon River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does CR 360 over Leon River carry?

About 110 vehicles per day (2013 count).

How long is CR 360 over Leon River?

The structure is 122 ft (37.2 m) long with a longest span of 41 ft (12.5 m) and a deck 26 ft wide.

Who owns CR 360 over Leon River?

It is owned by the County Highway Agency.