SH 6 over Leon River
FairComanche County, Texas · 4.20 MI W of Erath C/L · Structure no. 230470025705028
- Built
- 1950
- 75 years old, rebuilt 1990
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 642 ft
- 12 main spans
- Daily traffic
- 3,751
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SH 6 over Leon River is a steel continuous stringer/multi-beam or girder carrying SH 6 over Leon River in Comanche County, Texas. It was built in 1950 and reconstructed in 1990, so it is 75 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,751 vehicles a day, roughly 33% of them trucks, projected to reach 6,800 by 2033. The structure is 642 ft (195.7 m) long and 46 ft wide. If it were closed, the detour would be 29.8 mi (48 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 6 over Leon River built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 1990.
What condition is SH 6 over Leon River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does SH 6 over Leon River carry?
About 3,751 vehicles per day (2023 count), of which roughly 33% are trucks.
How long is SH 6 over Leon River?
The structure is 642 ft (195.7 m) long with a longest span of 50 ft (15.2 m) and a deck 46 ft wide.
Who owns SH 6 over Leon River?
It is owned by the State Highway Agency.