US Bridges

CR 208 over Harvey Creek

Good

Colorado County, Texas · 0.25 MI N of CR 205 · Structure no. 130450AA0208001

Built
2010
15 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
70 ft
1 main span
Daily traffic
90
2018 count
Owner
County
County Highway Agency

About this bridge

CR 208 over Harvey Creek is a prestressed concrete stringer/multi-beam or girder carrying CR 208 over Harvey Creek in Colorado County, Texas. It was built in 2010, so it is 15 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 90 vehicles a day, projected to reach 100 by 2038. The structure is 70 ft (21.3 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCR 208
CrossesHarvey Creek
Location0.25 MI N of CR 205
RouteCounty Highway 208
StateTexas
Coordinates29.74385, -96.71601
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length70 ft (21.3 m)
Longest span70 ft (21.3 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic90 (2018)
Projected traffic100 by 2038
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 208 over Harvey Creek built?

It was built in 2010, making it 15 years old in 2025.

What condition is CR 208 over Harvey Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does CR 208 over Harvey Creek carry?

About 90 vehicles per day (2018 count).

How long is CR 208 over Harvey Creek?

The structure is 70 ft (21.3 m) long with a longest span of 70 ft (21.3 m) and a deck 26 ft wide.

Who owns CR 208 over Harvey Creek?

It is owned by the County Highway Agency.