US Bridges

US 83 SB over Salt Fork of Red River

Fair

Collingsworth County, Texas · 0.50 MI N of FM 1981 · Structure no. 250440003103016

Built
1975
50 years old
Condition
Fair
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
840 ft
8 main spans
Daily traffic
1,020
2013 count
Owner
State
State Highway Agency

About this bridge

US 83 SB over Salt Fork of Red River is a prestressed concrete continuous stringer/multi-beam or girder carrying US 83 SB over Salt Fork of Red River in Collingsworth County, Texas. It was built in 1975, so it is 50 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,020 vehicles a day, roughly 39% of them trucks, projected to reach 1,430 by 2033. The structure is 840 ft (256 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS 83 SB
CrossesSalt Fork of Red River
Location0.50 MI N of FM 1981
RouteU.S. Route 83
StateTexas
Coordinates34.95749, -100.22145
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans8 (+2 approach)
Design loadHS 20
Structure length840 ft (256 m)
Longest span90 ft (27.4 m)
Deck width44 ft (13.5 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,020 (2013)
Projected traffic1,430 by 2033
Trucks39%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 83 SB over Salt Fork of Red River built?

It was built in 1975, making it 50 years old in 2025.

What condition is US 83 SB over Salt Fork of Red River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does US 83 SB over Salt Fork of Red River carry?

About 1,020 vehicles per day (2013 count), of which roughly 39% are trucks.

How long is US 83 SB over Salt Fork of Red River?

The structure is 840 ft (256 m) long with a longest span of 90 ft (27.4 m) and a deck 44 ft wide.

Who owns US 83 SB over Salt Fork of Red River?

It is owned by the State Highway Agency.