US Bridges

US 84 over Drainage Ditch

Fair

Coleman County, Texas · 2.40 MI SE of Taylor C/L · Structure no. 230420005402055

Built
1935
90 years old, rebuilt 1985
Condition
Fair
inspected July 2023
Type
Culvert
Concrete
Length
27 ft
3 main spans
Daily traffic
2,663
2020 count
Owner
State
State Highway Agency

About this bridge

US 84 over Drainage Ditch is a concrete culvert carrying US 84 over Drainage Ditch in Coleman County, Texas. It was built in 1935 and reconstructed in 1985, so it is 90 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,663 vehicles a day, roughly 12% of them trucks, projected to reach 4,550 by 2033. The structure is 27 ft (8.2 m) long and 75 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesUS 84
CrossesDrainage Ditch
Location2.40 MI SE of Taylor C/L
RouteU.S. Route 84
StateTexas
Coordinates32.0512, -99.67686
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadH 15
Structure length27 ft (8.2 m)
Longest span8 ft (2.4 m)
Deck width75 ft (22.9 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,663 (2020)
Projected traffic4,550 by 2033
Trucks12%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$33,000
NavigationNo navigation control on waterway

Frequently asked questions

When was US 84 over Drainage Ditch built?

It was built in 1935, making it 90 years old in 2025. It was reconstructed in 1985.

What condition is US 84 over Drainage Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does US 84 over Drainage Ditch carry?

About 2,663 vehicles per day (2020 count), of which roughly 12% are trucks.

How long is US 84 over Drainage Ditch?

The structure is 27 ft (8.2 m) long with a longest span of 8 ft (2.4 m) and a deck 75 ft wide.

Who owns US 84 over Drainage Ditch?

It is owned by the State Highway Agency.