US Bridges

SH 204 over Mud Creek Relief

Fair

Cherokee County, Texas · 9.20 MI S of US 79 · Structure no. 100370019807024

Built
1963
62 years old
Condition
Fair
inspected January 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
182 ft
6 main spans
Daily traffic
1,537
2021 count
Owner
State
State Highway Agency

About this bridge

SH 204 over Mud Creek Relief is a concrete stringer/multi-beam or girder carrying SH 204 over Mud Creek Relief in Cherokee County, Texas. It was built in 1963, so it is 62 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,537 vehicles a day, roughly 34% of them trucks, projected to reach 2,152 by 2041. The structure is 182 ft (55.5 m) long and 44 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSH 204
CrossesMud Creek Relief
Location9.20 MI S of US 79
RouteState Highway 204
StateTexas
Coordinates31.90094, -95.10128
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans6
Design loadH 20
Structure length182 ft (55.5 m)
Longest span30 ft (9.1 m)
Deck width44 ft (13.5 m)
Roadway width43 ft (13 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,537 (2021)
Projected traffic2,152 by 2041
Trucks34%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 204 over Mud Creek Relief built?

It was built in 1963, making it 62 years old in 2025.

What condition is SH 204 over Mud Creek Relief in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.

How much traffic does SH 204 over Mud Creek Relief carry?

About 1,537 vehicles per day (2021 count), of which roughly 34% are trucks.

How long is SH 204 over Mud Creek Relief?

The structure is 182 ft (55.5 m) long with a longest span of 30 ft (9.1 m) and a deck 44 ft wide.

Who owns SH 204 over Mud Creek Relief?

It is owned by the State Highway Agency.