Bolivar Avenue over Resaca Del Rancho Viejo
FairPosted for loadCameron County, Texas · 0.07 MI S of Cortez Ave · Structure no. 210310U00010001
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected March 2024
- Type
- Slab
- Concrete
- Length
- 26 ft
- 1 main span
- Daily traffic
- 1,044
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Bolivar Avenue over Resaca Del Rancho Viejo is a concrete slab carrying Bolivar Avenue over Resaca Del Rancho Viejo in Cameron County, Texas. It was built in 1972, so it is 53 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,044 vehicles a day, roughly 3% of them trucks, projected to reach 600 by 2042. The structure is 26 ft (7.9 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bolivar Avenue over Resaca Del Rancho Viejo built?
It was built in 1972, making it 53 years old in 2025.
What condition is Bolivar Avenue over Resaca Del Rancho Viejo in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Bolivar Avenue over Resaca Del Rancho Viejo carry?
About 1,044 vehicles per day (2024 count), of which roughly 3% are trucks.
How long is Bolivar Avenue over Resaca Del Rancho Viejo?
The structure is 26 ft (7.9 m) long with a longest span of 25 ft (7.6 m) and a deck 24 ft wide.
Who owns Bolivar Avenue over Resaca Del Rancho Viejo?
It is owned by the City or Municipal Highway Agency.