E Morrison RD over Ccdd # 1 Ditch No. 1
FairCameron County, Texas · 1.25 MI E of US 77 · Structure no. 210310C03065001
- Built
- 2012
- 13 years old
- Condition
- Fair
- inspected March 2024
- Type
- Culvert
- Concrete
- Length
- 72 ft
- 3 main spans
- Daily traffic
- 15,268
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
E Morrison RD over Ccdd # 1 Ditch No. 1 is a concrete culvert carrying E Morrison RD over Ccdd # 1 Ditch No. 1 in Cameron County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,268 vehicles a day, roughly 4% of them trucks, projected to reach 23,080 by 2042. The structure is 72 ft (21.9 m) long. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E Morrison RD over Ccdd # 1 Ditch No. 1 built?
It was built in 2012, making it 13 years old in 2025.
What condition is E Morrison RD over Ccdd # 1 Ditch No. 1 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does E Morrison RD over Ccdd # 1 Ditch No. 1 carry?
About 15,268 vehicles per day (2022 count), of which roughly 4% are trucks.
How long is E Morrison RD over Ccdd # 1 Ditch No. 1?
The structure is 72 ft (21.9 m) long with a longest span of 10 ft (3 m).
Who owns E Morrison RD over Ccdd # 1 Ditch No. 1?
It is owned by the City or Municipal Highway Agency.