Anacua Street over Ccwid #6 Main Canal
GoodCameron County, Texas · 0.1 MI E of JCT US 77 · Structure no. 210310C01300001
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected March 2024
- Type
- Culvert
- Concrete
- Length
- 34 ft
- 4 main spans
- Daily traffic
- 7,862
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Anacua Street over Ccwid #6 Main Canal is a concrete culvert carrying Anacua Street over Ccwid #6 Main Canal in Cameron County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,862 vehicles a day, roughly 2% of them trucks, projected to reach 12,416 by 2042. The structure is 34 ft (10.4 m) long. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Anacua Street over Ccwid #6 Main Canal built?
It was built in 2002, making it 23 years old in 2025.
What condition is Anacua Street over Ccwid #6 Main Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does Anacua Street over Ccwid #6 Main Canal carry?
About 7,862 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is Anacua Street over Ccwid #6 Main Canal?
The structure is 34 ft (10.4 m) long with a longest span of 6 ft (1.8 m).
Who owns Anacua Street over Ccwid #6 Main Canal?
It is owned by the City or Municipal Highway Agency.