FM 3195 Stuart RD over CCDD#5 Drain Ditch
FairCameron County, Texas · 0.4 MI N of US 83 · Structure no. 210310330401001
- Built
- 2003
- 22 years old
- Condition
- Fair
- inspected July 2024
- Type
- Culvert
- Concrete
- Length
- 30 ft
- 2 main spans
- Daily traffic
- 14,701
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
FM 3195 Stuart RD over CCDD#5 Drain Ditch is a concrete culvert carrying FM 3195 Stuart RD over CCDD#5 Drain Ditch in Cameron County, Texas. It was built in 2003, so it is 22 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,701 vehicles a day, roughly 2% of them trucks, projected to reach 11,530 by 2037. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 3195 Stuart RD over CCDD#5 Drain Ditch built?
It was built in 2003, making it 22 years old in 2025.
What condition is FM 3195 Stuart RD over CCDD#5 Drain Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does FM 3195 Stuart RD over CCDD#5 Drain Ditch carry?
About 14,701 vehicles per day (2024 count), of which roughly 2% are trucks.
How long is FM 3195 Stuart RD over CCDD#5 Drain Ditch?
The structure is 30 ft (9.1 m) long with a longest span of 10 ft (3 m).
Who owns FM 3195 Stuart RD over CCDD#5 Drain Ditch?
It is owned by the State Highway Agency.