US Bridges

FM 509 over Harlingen Airport Drain

Good

Cameron County, Texas · 1.00 MI N of FM 1595 · Structure no. 210310236901002

Built
2001
24 years old
Condition
Good
inspected July 2024
Type
Culvert
Concrete
Length
36 ft
3 main spans
Daily traffic
1,296
2023 count
Owner
State
State Highway Agency

About this bridge

FM 509 over Harlingen Airport Drain is a concrete culvert carrying FM 509 over Harlingen Airport Drain in Cameron County, Texas. It was built in 2001, so it is 24 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,296 vehicles a day, roughly 33% of them trucks, projected to reach 2,411 by 2042. The structure is 36 ft (11 m) long. If it were closed, the detour would be 6.8 mi (11 km).

CarriesFM 509
CrossesHarlingen Airport Drain
Location1.00 MI N of FM 1595
RouteState Highway 509
StateTexas
Coordinates26.23114, -97.63247
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length36 ft (11 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,296 (2023)
Projected traffic2,411 by 2042
Trucks33%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 509 over Harlingen Airport Drain built?

It was built in 2001, making it 24 years old in 2025.

What condition is FM 509 over Harlingen Airport Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does FM 509 over Harlingen Airport Drain carry?

About 1,296 vehicles per day (2023 count), of which roughly 33% are trucks.

How long is FM 509 over Harlingen Airport Drain?

The structure is 36 ft (11 m) long with a longest span of 10 ft (3 m).

Who owns FM 509 over Harlingen Airport Drain?

It is owned by the State Highway Agency.