Lp 499 over Ccwid #1 Main N Drain
FairCameron County, Texas · 0.60 MI E of US 77 · Structure no. 210310113702002
- Built
- 1978
- 47 years old, rebuilt 2004
- Condition
- Fair
- inspected March 2023
- Type
- Slab
- Concrete Continuous
- Length
- 80 ft
- 3 main spans
- Daily traffic
- 13,770
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Lp 499 over Ccwid #1 Main N Drain is a concrete continuous slab carrying Lp 499 over Ccwid #1 Main N Drain in Cameron County, Texas. It was built in 1978 and reconstructed in 2004, so it is 47 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,770 vehicles a day, roughly 7% of them trucks, projected to reach 19,060 by 2033. The structure is 80 ft (24.4 m) long and 105 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lp 499 over Ccwid #1 Main N Drain built?
It was built in 1978, making it 47 years old in 2025. It was reconstructed in 2004.
What condition is Lp 499 over Ccwid #1 Main N Drain in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Lp 499 over Ccwid #1 Main N Drain carry?
About 13,770 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is Lp 499 over Ccwid #1 Main N Drain?
The structure is 80 ft (24.4 m) long with a longest span of 30 ft (9.1 m) and a deck 105 ft wide.
Who owns Lp 499 over Ccwid #1 Main N Drain?
It is owned by the State Highway Agency.